Water Supply Analysis
Plot system requirements against achieved test results with automatic pass/fail assessment
📋 Report Details
Company Name
License # | Phone
| Zone Name | Flow (L/min) | Pressure (kPa) |
|---|
| Data Points | Flow (L/min) | Pressure (kPa) |
|---|
💾 Want to save your tests?
Sign in to save results, add site details, and generate professional PDF reports.
Sign In / Create Free AccountHow It Works
1. Add System Requirements — Enter the flow and pressure each zone needs (from design docs or AS 2419.1)
2. Add Test Results — Enter at least 2 measured points (static + flowing, or multiple flow points)
3. Calculate — The tool interpolates/extrapolates the supply curve and checks if requirements are met
Reference: AS 2419.1 Fire hydrant installations, AS 2941 Fixed fire protection installations - Pumpset systems
We provide no warranty or guarantee for the use of this tool or its accuracy. In no event will we be liable for any loss or damage, including, without limitation, indirect or consequential loss or damage, or any loss or damage arising from loss of data or profits arising out of, or in connection with, the use of this tool.